Access control installers in South Dakota: who can wire your doors
South Dakota has no alarm or low-voltage license we could find; alarm firms wiring Class 2 or 3 circuits are exempt from the electrician license.

- Door access license across the state
- Power-limited alarm wiring is exempt from electrician licensing; the state issues no license
- Work on line voltage
- The State Electrical Commission handles licensing
- Code for electrical work
- Permits from Nov. 12, 2024 onward use the 2023 NEC
- Verify an electrician
- Call 605.773.3573 or email the Commission
Check an installer's license
South Dakota Electrical Commission, Department of Labor and Regulation keeps these records. Search by name or license number.
Open the South Dakota lookupGet a price for your doors
Exemption covering Class 2 and Class 3 work
For most electrical jobs in South Dakota, you need a license from the State Electrical Commission. Under state law, chapter 36-16 treats unlicensed work as a Class 2 misdemeanor.
The chapter goes on to specify which people are not required to hold an electrician’s license. Employees who wire Class 2 or Class 3 signaling circuits (power-limited) for an alarm and communications company are covered by item 9. These are the low-energy circuits that the National Electrical Code sets, and they deliver power to keypads, card readers, door contacts and most electric strikes. The item includes power-limited fire protective signaling circuits as well.
There is a requirement, though. A person qualified in the work must design it, oversee it or install it.
When a licensed electrician is needed
The exemption ends where power-limited wiring ends. Adding a 120-volt circuit for a door controller, gate operator or power supply is regular electrical work. That portion calls for a licensed electrical contractor or a licensed electrician.
The Commission requires a $10,000 undertaking from an electrical contractor or Class B electrician before a license is issued. They also have to hold liability insurance that covers no less than $100,000 per occurrence and $300,000 total.
- Apprentice route: 4 years and 8,000 hours with a contractor, then you sit for the journeyman exam.
- Journeyman path: another 2 years and 4,000 hours, including 2,000 in commercial work, before the contractor exam.
- To renew: 16 hours of continuing education, and at least 8 of those hours must cover the code.
How to verify the person you hire
The Electrical Commission will check a license if you ask. Its complaints and verification page gives the phone number 605.773.3573 and an email contact. Request the license number of the person handling the power side.
If a firm only does low-voltage work, there is no state alarm license for you to verify. Instead, ask the company who designs and oversees its jobs, and reach out to your city to see if a local business license is needed.
Code editions for electrified doors
Permits arriving on or after November 12, 2024 get inspected by the Electrical Commission against the 2023 National Electrical Code.
Under chapter 11-10, any local non‑residential building ordinance must meet the 2024 International Building Code. In a town or county with no such ordinance, the same 2024 code governs the design of any building started after July 1, 2026. The rules that say how a locked exit must open during an emergency are in the IBC.
Cost to install, by door
The published ranges for the U.S. depend on what your doors are fitted with now. A South Dakota installer will confirm the price once they have looked at the doors.
| On the doors now | Installed, per door |
|---|---|
| Keys only | $1,200 to $2,500 |
| Keypads | $500 to $1,500 |
| Card or fob readers | $500 to $1,500 |
| Not sure | $1,000 to $3,000 |
If you install keypads in South Dakota, is an electrician’s license required?
It is not required when an alarm and communications company employee wires the power-limited Class 2 or Class 3 circuits. The line-voltage feed that powers the equipment is separate work, and it calls for a license.
Compare licenses in every state
Installers for access control in other states
- Alabama
- Alaska
- Arizona
- Arkansas
- California
- Colorado
- Connecticut
- Delaware
- District of Columbia
- Florida
- Georgia
- Hawaii
- Idaho
- Illinois
- Indiana
- Iowa
- Kansas
- Kentucky
- Louisiana
- Maine
- Maryland
- Massachusetts
- Michigan
- Minnesota
- Mississippi
- Missouri
- Montana
- Nebraska
- Nevada
- New Hampshire
- New Jersey
- New Mexico
- New York
- North Carolina
- North Dakota
- Ohio
- Oklahoma
- Oregon
- Pennsylvania
- Rhode Island
- South Carolina
- Tennessee
- Texas
- Utah
- Vermont
- Virginia
- Washington
- West Virginia
- Wisconsin
- Wyoming
